DESCRIPTION

Cost Effective Car Park Resurfacing

Resincoat Car Park Decking System is designed as a cost effective way to achieve a premium decked finish in a car park or vehicle storage area. The polyurethane system is used widely across the UK in service stations and public car parks. As with all Resincoat products, our system is designed in the UK by our expert team of resin chemists and flooring installers. Between our team we test, re-formulate and tweak our formula to make it the best option on the market for longevity and ease of installation.

 

COVERAGE RATES

Please see below for coverage rates. If you are coating a large area and would like expert advice, please call our team who will be happy to assist you.

5kg: up to 15m²

Please note: the above coverage rates are per coat, in most cases we advise 2 coats.

 

APPLICATION GUIDE

Preparation

Old paint finishes should be removed if flaking at all and the surface should be sanded to create a texture (also known as a mechanical key) prior to applying Resincoat Car Park Decking System. When preparing for a floor coat, doing so mechanically (shot-blasting or grinding) is always advisable for best results, but if that is not possible then sanding the area or our Etch and Clean is a good alternative. After the surface has been completely abraded, thoroughly sweep and vacuum the area of any remaining dust or contaminants. For more information on preparation, please see technical data sheet. 

Please note: Etch and Clean is only suitable for use on bare concrete.

 

Priming

For new concrete floors or floors in good condition, prime with Resincoat Damp Tolerant Primer

For dusty, old or weaker floors prime with Resincoat Deep Penetrating Primer

For greasy floors with heavy oil residue clean thoroughly using a suitable degreaser scraping off any dust or dirt and then prime with Resincoat Oil Tolerant Primer

 

Application

We advise when applying this product the ambient temperature is at least 7°C.

1. Mix Part A on its own with a mixing paddle attached to an electric drill for about 1 minute before adding ALL of Part B and continue to mix for another 90 seconds, keeping the paddle in suspension to avoid mixing air into the unit.

2. Pour entirety of the tin's contents into a plastic paint scuttle or tray.

3. Immediately begin applying your paint with a nylon-bonded resin suitable roller.

4. Use a brush around the edges to cut in (a second pair of hands can be useful for this stage).

5. As soon as the first coat has started curing (is no longer tacky to touch) you can re-coat; this should take 12-24 hours.

6. The cured final coat is ok for foot traffic. Cars and heavy objects, however, should be left off the new coating for the first 48 hours and chemicals including water should not be introduced for the first 7 days (Full chemical cure).

 

PLEASE NOTE: The pot life of this product is 20 minutes. This means that once parts have been mixed, the paint will start to chemically cure after this time. Ensure you remove the paint from the tin in this window. The paint will then be workable on your floor for up to 40 minutes. 

Pot life = Time to harden in pot following addition of hardener

Working Time = Time to apply product before it becomes unworkable

  

USEFUL INFORMATION

Roller sleeves should be used once per coat, two coats will require two roller sleeves.

This product is NOT UV stable therefore can discolour when exposed to regular sunlight. For areas with plenty of repeated sunlight, please coat with a coloured UVR coating such as Resincoat Chemical Resistant UVR Floor Coating for a UV stable finish.

This product should NOT be split. Taking smaller quantities from each tin, even if measured correctly, may cause issues with activating.

This product is NOT self levelling.

CPD001

Data sheet

Appearance
Smooth, Medium Gloss Finish
Composition
Polyurethane System
Substrates
Bare Concrete, Wood, Screeds, Steel
Product Components
Resin (Part A) + Activator (Part B)
Typical Installations
Car Parks, Factories, Vehicle Storage Areas, Chemical Plants, Warehousing, Etc
Solvent Content
Solvent Free
Re-coat/Foot-traffic Time (at 20°C)
8-12 Hours
Drying Time (at 20°C)
12-24 Hours
Pot Life
The Pot Life Of This Product Is 20 Minutes
Application Tools
Rollers, Brushes

Specific References

ean13
5056489456741
upc
500708125116

Download

Car Park Decking System TDS

Download (1.27MB)

Colour Chart

Download (129.88KB)

16 other products in the same category:

Comments (1)
Reviews